Hollow core slab ultra simple technic to get a perfect leveling at the installation phase used in the Middle east largest mall DCC ( Dora Commercial center - Beirut-Lebanon-200 000m2 of construction)

On going project Dora Commercial center - Beirut-Lebanon-200 000m2 of construction
Owner : ADMIC
Main Contractor : MAN Enterprises sal
Consultant : Rudolph Mattar
Grid 850cmx850cm - About 100 000m2 of hollow core slab with variable load and a variable depth
16+8cm to 26.5+8cm - 15 000m2 of predalle slab with a load of about 2000 kg/m2 - Depth 6+29cm

Hollow core slab ultra simple technic to get a perfect leveling at the installation phase : this levelling operation is well known but the way it was carried on with such simple tools makes it as a brillant innovation . The picture explains itself .
Mega Prefab sal thanks
All who financed ,designed,supervised,managed and build this mall , a group of teams highly dedicated to quality , safety and completion on time .
|